New Items Keep Coming While the Migration Data Is Cleansed

Item requests do not pause for a migration. A daily cataloguing routine keeps new and changed records aligned with the cleansed baseline.

Take an illustrative palm oil group whose mills and estates raise about 40 item requests a week. Across a 26-week cleansing programme for an ERP migration, that is roughly 1,040 requests for new items, changes and deletions arriving while the migration data is being cleansed.Ambil contoh ilustratif sebuah grup kelapa sawit yang pabrik dan kebunnya mengajukan sekitar 40 request item per minggu. Selama program cleansing 26 minggu untuk migrasi ERP, berarti ada kurang lebih 1.040 request item baru, perubahan, dan penghapusan yang masuk saat data migrasi sedang dibersihkan.

Item requests do not stop because a migration has started. Daily cataloguing is the routine that processes each Create, Change and Delete request with the same naming rules, classification and duplicate checks the project team uses, so new and changed records stay aligned with the cleansed baseline instead of becoming a delta to clean again before cutover.Request item tidak berhenti hanya karena migrasi sudah dimulai. Daily cataloguing adalah rutinitas yang memproses setiap request Create, Change, dan Delete dengan aturan penamaan, klasifikasi, dan pengecekan duplikat yang sama dengan tim proyek. Dengan begitu, item baru dan perubahan tetap selaras dengan baseline yang sudah dibersihkan, bukan menjadi delta yang harus dibersihkan lagi sebelum cutover.

The rest of this page follows a simple 3-2-1 map. It covers what keeps arriving, who shares the material master during the programme, and what both sides are protecting.Pembahasan selanjutnya mengikuti peta 3-2-1 yang sederhana: apa yang terus masuk, siapa yang berbagi material master selama program berjalan, dan apa yang dijaga oleh kedua pihak.

3Request typesCreate, Change and Delete keep arriving every working day.Jenis requestCreate, Change, dan Delete terus masuk setiap hari kerja.
2TeamsThe migration project team and the daily cataloguing team.TimTim proyek migrasi dan tim daily cataloguing.
1BaselineOne cleansed version of the material master, protected until cutover.BaselineSatu versi material master yang sudah bersih, dijaga sampai cutover.

Daily cataloguing handles each request as it arrives while the project cleans what already existsDaily cataloguing menangani setiap request yang masuk, sementara proyek membersihkan data yang sudah ada

A migration cleansing project works on an extract. On a fixed date, the legacy material master is copied out, and the project team assesses it, agrees naming and classification rules, cleanses and standardises the descriptions, assigns codes and prepares an ERP-ready load file. In the illustrative group above, that extract might hold 25,000 records. The project's job is to turn those 25,000 records into an agreed baseline.Proyek cleansing untuk migrasi bekerja di atas sebuah extract. Pada tanggal tertentu, material master di sistem lama disalin keluar. Tim proyek lalu menilainya, menyepakati aturan penamaan dan klasifikasi, membersihkan dan menstandarkan deskripsi, memberi kode, dan menyiapkan file muat yang siap untuk ERP. Pada contoh grup di atas, extract itu misalnya berisi 25.000 record. Tugas proyek adalah mengubah 25.000 record tersebut menjadi baseline yang disepakati.

Daily cataloguing works on the flow instead of the stock. A dedicated team of cataloguers receives every Create, Change and Delete request raised by the mills, estates, warehouse and procurement, checks it, and catalogues it to the agreed standard. The team does not wait for a project phase to finish. It handles the requests that operations raise on any given day.Daily cataloguing bekerja pada aliran request, bukan pada tumpukan data lama. Tim cataloguer khusus menerima setiap request Create, Change, dan Delete dari pabrik, kebun, gudang, dan procurement, memeriksanya, lalu mengatalogkannya sesuai standar yang disepakati. Tim ini tidak menunggu satu fase proyek selesai. Yang ditangani adalah request yang muncul dari operasi pada hari itu juga.

Three terms make the rest of the discussion precise. The baseline is the cleansed, agreed version of the material master that will be loaded into the new ERP. The delta is every record created, changed or flagged in the legacy system after the extract date. Cutover is the point at which the legacy system stops being the system of record and the new ERP takes over.Tiga istilah berikut membuat pembahasan lebih tepat. Baseline adalah versi material master yang sudah dibersihkan dan disepakati, yang nantinya dimuat ke ERP baru. Delta adalah setiap record yang dibuat, diubah, atau ditandai di sistem lama setelah tanggal extract. Cutover adalah titik ketika sistem lama tidak lagi menjadi acuan resmi dan ERP baru mengambil alih.

Seen this way, the two kinds of work are not alternatives. The project shrinks the backlog of legacy records. Daily cataloguing keeps the delta from growing into a second backlog.Dari sudut ini, kedua jenis pekerjaan tersebut bukan pilihan yang saling menggantikan. Proyek mengurangi tumpukan record lama, sedangkan daily cataloguing menjaga agar delta tidak tumbuh menjadi tumpukan kedua.

A cleansed baseline starts to drift on the day the data is extractedBaseline yang sudah bersih mulai bergeser sejak hari data di-extract

The legacy ERP stays live for the whole programme, because the mills keep processing fresh fruit bunches and the estates keep running their fleets. A screw press worm wears out, a sterilizer door gasket fails, a boiler tube needs replacing. Each event can produce a request, and each request lands in the legacy system that the project has already copied and is now cleaning somewhere else.Sistem ERP lama tetap berjalan sepanjang program, karena pabrik tetap mengolah tandan buah segar dan kebun tetap mengoperasikan armadanya. Worm screw press aus, gasket pintu sterilizer bocor, tube boiler perlu diganti. Setiap kejadian bisa memunculkan request, dan setiap request masuk ke sistem lama yang datanya sudah disalin dan sedang dibersihkan oleh proyek di tempat lain.

Using the illustrative split of 40 weekly requests, about 28 might be Create, 9 might be Change and 3 might be Delete. Each type drifts away from the baseline in its own way.Dengan pembagian ilustratif dari 40 request per minggu, sekitar 28 bisa berupa Create, 9 berupa Change, dan 3 berupa Delete. Setiap jenis request menggeser data dari baseline dengan caranya sendiri.

Create requests bring back duplicates and non-standard namesRequest Create memunculkan lagi duplikat dan nama yang tidak standar

A requester searches the legacy system for a bearing and finds nothing that matches, because the old record reads "BEARING 6205-2RS SKF" and the search used "6205 2RS". A new code is created. Meanwhile, the project team has already merged three legacy versions of that bearing into one record named "BRG, BALL 6205 2RS". The baseline is clean, and the legacy system now holds a fourth version that the project has not seen.Seorang requester mencari bearing di sistem lama dan tidak menemukan yang cocok, karena record lamanya tertulis "BEARING 6205-2RS SKF" sementara kata kunci yang dipakai "6205 2RS". Kode baru pun dibuat. Padahal tim proyek sudah menggabungkan tiga versi lama bearing tersebut menjadi satu record bernama "BRG, BALL 6205 2RS". Baseline-nya bersih, tetapi sistem lama kini menyimpan versi keempat yang belum pernah dilihat proyek.

Naming drifts in the same way. A request for a sterilizer door seal arrives as free text in the requester's own words, while the project dictionary already defines the noun, the modifier and the attribute template for that item. Without someone applying the dictionary on the day the record is created, the record enters the delta in a form the project will have to rework.Penamaan bergeser dengan cara yang sama. Request seal pintu sterilizer masuk sebagai teks bebas dengan istilah buatan requester, padahal dictionary proyek sudah menetapkan noun, modifier, dan template atribut untuk item tersebut. Jika tidak ada yang menerapkan dictionary pada hari record dibuat, record itu masuk ke delta dalam bentuk yang nanti harus dikerjakan ulang oleh proyek.

Change requests split one record into two versionsRequest Change memecah satu record menjadi dua versi

A buyer updates the manufacturer part number on a thresher drum bearing after a supplier substitution. The change is correct, but it is made in the legacy system, while the cleansed version in the project workbook still carries the old value. At the next extract refresh, someone has to decide which version is right, and that decision needs evidence that is easy to lose after several weeks.Seorang buyer memperbarui part number manufacturer untuk bearing thresher drum setelah supplier mengganti produknya. Perubahan itu benar, tetapi dilakukan di sistem lama, sementara versi bersih di workbook proyek masih memuat nilai lama. Saat extract diperbarui, harus ada yang memutuskan versi mana yang benar, dan bukti untuk keputusan itu mudah hilang setelah beberapa minggu.

Delete requests collide with records the project is still usingRequest Delete berbenturan dengan record yang masih dipakai proyek

The warehouse flags an obsolete ripple mill part for deletion in the legacy system, while the project has mapped the same record as the survivor of a duplicate merge. The reverse also happens: the project marks a duplicate for deletion, but the record still carries stock or an open purchase order at one of the mills. Without one place where both sides see the same decision, each team can undo the other's work without knowing it.Gudang menandai part ripple mill yang sudah usang untuk dihapus di sistem lama, padahal proyek sudah memetakan record yang sama sebagai record utama hasil penggabungan duplikat. Kebalikannya juga terjadi: proyek menandai satu duplikat untuk dihapus, tetapi record itu masih memiliki stok atau purchase order terbuka di salah satu pabrik. Tanpa satu tempat di mana kedua pihak melihat keputusan yang sama, setiap tim bisa membatalkan pekerjaan tim lain tanpa sadar.

Every request left unmanaged becomes delta work that lands just before cutoverSetiap request yang tidak dikelola menjadi pekerjaan delta yang menumpuk menjelang cutover

The delta does not stay small on its own. If, in the illustrative group, about 45% of the 1,040 requests leave the agreed standard in some way, the project inherits around 470 records to review, re-cleanse or reconcile. Most of that work surfaces at the last extract refresh, which is usually the point where the programme has the least time to spare.Delta tidak akan tetap kecil dengan sendirinya. Jika pada contoh grup tadi sekitar 45% dari 1.040 request keluar dari standar yang disepakati, proyek mewarisi sekitar 470 record yang harus direview, dibersihkan ulang, atau direkonsiliasi. Sebagian besar pekerjaan itu baru terlihat pada pembaruan extract terakhir, yang biasanya justru menjadi saat program paling sempit waktunya.

Records needing rework before cutover, with and without a daily routineRecord yang perlu dikerjakan ulang sebelum cutover, dengan dan tanpa rutinitas harian

Illustrative example · cumulative records over a 6-month cleansing programmeContoh ilustratif · jumlah kumulatif record selama program cleansing 6 bulan

00 125125 250250 375375 500500 Month 5380Bulan 5380 3030
ExtractExtract M1B1 M2B2 M3B3 M4B4 M5B5 M6B6
Without a daily routine (470 by month 6)Tanpa rutinitas harian (470 pada bulan 6) Delta to re-cleanseDelta yang harus dibersihkan ulang With a daily cataloguing routine (30 by month 6)Dengan rutinitas daily cataloguing (30 pada bulan 6) Extract dateTanggal extract

Illustrative example. Conceptual figures for a group raising about 40 requests a week, not based on measured data. The smaller line assumes a few urgent requests still bypass the routine and are reviewed afterwards.Contoh ilustratif. Angka konseptual untuk grup dengan sekitar 40 request per minggu, bukan hasil pengukuran. Garis yang lebih rendah mengasumsikan masih ada beberapa request mendesak yang lolos dari rutinitas dan direview setelahnya.

For a buying team, the cost of that delta shows up before cutover. Purchase orders raised against a duplicate code split the spend for one part across two records, which makes volume harder to see when quotations are compared. Requests that sit in free text are harder to group by category, so the spend analysis the new ERP is supposed to support starts with gaps.Bagi tim pembelian, dampak delta itu sudah terasa sebelum cutover. Purchase order yang dibuat dengan kode duplikat memecah spend satu part ke dua record, sehingga total volume sulit terlihat saat penawaran dibandingkan. Request yang masih berupa teks bebas juga sulit dikelompokkan per kategori, sehingga analisis spend yang seharusnya didukung ERP baru dimulai dengan celah.

The project feels it as reconciliation load. Every extract refresh means comparing the legacy delta with the baseline, deciding which records are new, which are duplicates of cleansed records and which carry changes that need to be accepted. When that comparison runs into hundreds of records in the final weeks, mock loads are more likely to fail validation, and decisions about individual items tend to be made under time pressure.Bagi proyek, dampaknya berupa beban rekonsiliasi. Setiap kali extract diperbarui, delta dari sistem lama harus dibandingkan dengan baseline untuk menentukan mana record baru, mana duplikat dari record yang sudah bersih, dan mana yang membawa perubahan yang perlu diterima. Ketika perbandingan itu mencapai ratusan record pada minggu-minggu terakhir, mock load lebih berisiko gagal validasi, dan keputusan per item cenderung diambil di bawah tekanan waktu.

Is your delta growing while the baseline is cleansed?Apakah delta Anda bertambah saat baseline sedang dibersihkan?

Book a free consultation to review how requests are handled during your migration programme.Jadwalkan konsultasi gratis untuk meninjau cara request ditangani selama program migrasi Anda.

Book a Free ConsultationJadwalkan Konsultasi Gratis

The baseline is only as clean as the last request that touched it.Baseline hanya sebersih request terakhir yang menyentuhnya.

The daily team and the project team split the work by time, not by recordTim harian dan tim proyek membagi pekerjaan berdasarkan waktu, bukan berdasarkan record

The simplest division is this. Everything that existed on the extract date belongs to the project. Everything raised after that date passes through the daily team first. Both teams use one rulebook, so a record catalogued on a Tuesday in month four looks the same as a record cleansed by the project in month two.Pembagian paling sederhana adalah sebagai berikut. Semua record yang sudah ada pada tanggal extract menjadi tanggung jawab proyek. Semua yang diajukan setelah tanggal itu melewati tim harian terlebih dahulu. Kedua tim memakai satu aturan yang sama, sehingga record yang dikatalogkan pada hari Selasa di bulan keempat tampak sama dengan record yang dibersihkan proyek di bulan kedua.

On a working day, the daily team receives a request, searches both the legacy master and the cleansed baseline, and checks whether the item already exists. If it does, the request is rejected and the requester is pointed to the existing record. If it does not, the cataloguer builds the record with the project dictionary: noun and modifier, attribute template, standard abbreviations and the agreed classification. Change and Delete requests are reviewed against the baseline before anything is altered, and each decision is logged.Dalam satu hari kerja, tim harian menerima request, mencari di master sistem lama dan di baseline yang sudah bersih, lalu memeriksa apakah item tersebut sudah ada. Jika sudah ada, request di-reject dan requester diarahkan ke record yang ada. Jika belum, cataloguer menyusun record dengan dictionary proyek: noun dan modifier, template atribut, singkatan standar, serta klasifikasi yang disepakati. Request Change dan Delete direview terhadap baseline sebelum ada yang diubah, dan setiap keputusan dicatat.

AreaAspek Migration project teamTim proyek migrasi Daily cataloguing teamTim daily cataloguing
Records in scopeRecord yang ditangani Legacy records that existed on the extract dateRecord lama yang sudah ada pada tanggal extract New requests and changes raised after the extract dateRequest baru dan perubahan yang diajukan setelah tanggal extract
RulesAturan Designs the dictionary, naming convention, attribute templates and classificationMerancang dictionary, naming convention, template atribut, dan klasifikasi Applies the same rules and raises gaps to the projectMenerapkan aturan yang sama dan melaporkan celah aturan ke proyek
Main outputOutput utama Cleansed baseline and ERP-ready load fileBaseline yang sudah bersih dan file muat siap ERP Catalogued records aligned with the baseline, plus a decision logRecord terkatalog yang selaras dengan baseline, plus log keputusan
Changes to cleansed recordsPerubahan pada record yang sudah bersih Decides the final version in the baselineMemutuskan versi akhir di baseline Logs the change with its reason and passes it to the projectMencatat perubahan beserta alasannya dan meneruskannya ke proyek
RhythmRitme Phased plan that ends at cutoverRencana bertahap yang selesai saat cutover Every working day, before and after go-liveSetiap hari kerja, sebelum dan sesudah go-live
HandoverSerah terima Receives the delta list and confirms what enters the baselineMenerima daftar delta dan mengonfirmasi apa yang masuk ke baseline Sends a delta list on an agreed schedule, for example weeklyMengirim daftar delta sesuai jadwal yang disepakati, misalnya mingguan

The table shows why the split works. The project keeps authority over the baseline, and the daily team keeps the delta small and documented. Neither team has to guess what the other changed.Tabel di atas menunjukkan mengapa pembagian ini berjalan. Proyek tetap memegang kendali atas baseline, sementara tim harian menjaga delta tetap kecil dan terdokumentasi. Tidak ada tim yang perlu menebak apa yang diubah tim lain.

Requests reach the daily team through the ANSI module in SCS®Request sampai ke tim harian melalui modul ANSI di SCS®

A single request path makes the split enforceable. In Spares Cataloguing System® (SCS®), the ANSI module is the data governance module where Create, Change and Delete requests are submitted through one controlled form. A submitted request appears in Item Request, the module checks whether the item already exists, and an existing item is rejected while a new one continues to cataloguing.Satu jalur request membuat pembagian ini bisa dijalankan. Di Spares Cataloguing System® (SCS®), modul ANSI adalah modul data governance tempat request Create, Change, dan Delete diajukan melalui satu formulir terkontrol. Request yang diajukan muncul di Item Request, lalu dicek apakah item tersebut sudah ada. Item yang sudah ada di-reject, sedangkan item yang belum ada berlanjut ke cataloguing.

Request path in the ANSI module in SCS®Jalur request di modul ANSI di SCS®

  1. RequestRequest
  2. ValidateValidasi
  3. ApprovePersetujuan
  4. CatalogueCataloguing
  5. MaintainPemeliharaan

Roles along the path: requester, reviewer, approver and data steward. Each step is recorded in an audit trail covering who, what, when, why and who approved.Peran di sepanjang jalur: requester, reviewer, approver, dan data steward. Setiap langkah tercatat dalam audit trail yang mencakup siapa, apa, kapan, mengapa, dan siapa yang menyetujui.

During a migration, that audit trail matters for a practical reason. When the project reconciles the delta, it can see who asked for each record, why, and who approved it, instead of reconstructing the history from emails and spreadsheets.Selama migrasi, audit trail itu penting karena alasan praktis. Saat proyek merekonsiliasi delta, tim bisa melihat siapa yang meminta setiap record, apa alasannya, dan siapa yang menyetujuinya, tanpa harus menyusun ulang riwayatnya dari email dan spreadsheet.

Five simple rules keep the transition period under controlLima aturan sederhana menjaga masa transisi tetap terkendali

The rules below are a suggested starting point for discussion between the project lead, the daily team and the functions that raise requests. They work best when they are written down and agreed before the extract date, or as soon as possible after it.Aturan berikut adalah titik awal yang disarankan untuk didiskusikan antara pemimpin proyek, tim harian, dan fungsi yang mengajukan request. Aturan ini paling efektif bila ditulis dan disepakati sebelum tanggal extract, atau secepatnya setelah itu.

  1. One door for every request. All Create, Change and Delete requests go through one channel. Direct creation in the legacy ERP is limited to an agreed urgent path, and every urgent record is reviewed by the daily team afterwards, for example on the next working day.Satu pintu untuk setiap request. Semua request Create, Change, dan Delete melewati satu jalur. Pembuatan langsung di ERP lama dibatasi pada jalur mendesak yang disepakati, dan setiap record mendesak direview oleh tim harian setelahnya, misalnya pada hari kerja berikutnya.

  2. One rulebook, one version. The daily team uses the same dictionary, naming convention and classification version as the project. When the project changes a rule, both teams switch on the same date.Satu aturan, satu versi. Tim harian memakai dictionary, naming convention, dan versi klasifikasi yang sama dengan proyek. Ketika proyek mengubah satu aturan, kedua tim beralih pada tanggal yang sama.

  3. Search the baseline, not only the legacy system. Before any new code is created, the cataloguer checks the cleansed baseline as well, because the matching record may exist there under its standard name.Cari di baseline, bukan hanya di sistem lama. Sebelum kode baru dibuat, cataloguer juga memeriksa baseline yang sudah bersih, karena record yang cocok mungkin sudah ada di sana dengan nama standarnya.

  4. Changes to cleansed records go to the project. The daily team logs the change and its reason, and the project decides whether the baseline version is updated. This keeps one owner for every record in scope.Perubahan pada record yang sudah bersih diserahkan ke proyek. Tim harian mencatat perubahan beserta alasannya, lalu proyek memutuskan apakah versi baseline diperbarui. Dengan cara ini, setiap record dalam scope tetap punya satu pemilik.

  5. A fixed delta handover and a freeze date. The daily team sends the delta list on an agreed schedule, and both teams agree a freeze date before the final extract, after which only urgent requests are accepted.Serah terima delta yang terjadwal dan tanggal freeze. Tim harian mengirim daftar delta sesuai jadwal yang disepakati, dan kedua tim menyepakati tanggal freeze sebelum extract terakhir. Setelah tanggal itu, hanya request mendesak yang diterima.

None of these rules needs a large team. In the illustrative group, 40 requests a week can be a steady workload for a small group of cataloguers. What matters is that the routine runs every day, so the delta has little room to pile up.Tidak satu pun aturan ini membutuhkan tim besar. Pada contoh grup tadi, 40 request per minggu bisa menjadi beban kerja yang stabil untuk beberapa cataloguer. Yang penting, rutinitas itu berjalan setiap hari, sehingga delta tidak sempat menumpuk banyak.

Want a second view on your transition rules?Ingin pandangan kedua soal aturan masa transisi Anda?

Talk to our cataloguing team, free of charge, about request handling during cleansing.Diskusikan penanganan request selama cleansing dengan tim cataloguing kami, tanpa biaya.

Talk to Our TeamDiskusi dengan Tim Kami

Panemu's Daily Cataloguing Service is designed to run alongside a migration programmeDaily Cataloguing Service dari Panemu dirancang untuk berjalan berdampingan dengan program migrasi

PT Panemu Solusi Industri (Panemu) provides the Daily Cataloguing Service as a dedicated team of cataloguers for day-to-day Create, Change and Delete requests. The team works in SCS®, where the dictionary, attribute templates, abbreviations and classification agreed for the project can be configured once and applied to both the cleansing work and the daily requests.PT Panemu Solusi Industri (Panemu) menyediakan Daily Cataloguing Service berupa tim cataloguer khusus untuk request Create, Change, dan Delete sehari-hari. Tim ini bekerja di SCS®, tempat dictionary, template atribut, singkatan, dan klasifikasi yang disepakati untuk proyek bisa dikonfigurasi sekali lalu diterapkan pada pekerjaan cleansing maupun request harian.

Two SCS® features are directly relevant during the transition. Screening for Duplicates runs when a part number or description is entered and shows matching items, which helps the cataloguer catch a request for a bearing that already exists under its standard name. Abbreviation builds short and long descriptions with standard abbreviations, which helps keep new records in the same format as the baseline.Dua fitur SCS® relevan langsung selama masa transisi. Screening for Duplicates berjalan saat part number atau deskripsi dimasukkan dan menampilkan item yang cocok, sehingga membantu cataloguer mengenali request bearing yang sebenarnya sudah ada dengan nama standarnya. Abbreviation menyusun short description dan long description dengan singkatan standar, sehingga membantu item baru tetap berformat sama dengan baseline.

When the migration cleansing itself is handled through Panemu's Material Cataloguing service, the project team and the daily team can work from the same configuration in SCS®. When another party runs the project, the daily team can apply the project's agreed rules, provided they are shared and kept up to date. In both cases, the scope is something to agree during a consultation, not a fixed package.Jika cleansing untuk migrasi ditangani melalui layanan Material Cataloguing dari Panemu, tim proyek dan tim harian bisa bekerja dengan konfigurasi yang sama di SCS®. Jika proyek dijalankan pihak lain, tim harian tetap bisa menerapkan aturan yang disepakati proyek, asalkan aturan itu dibagikan dan terus diperbarui. Pada kedua kondisi, scope-nya disepakati lewat konsultasi, bukan paket yang baku.

Plan the daily routine before your next extractRencanakan rutinitas harian sebelum extract berikutnya

Get a no-cost discussion on how daily cataloguing could work beside your migration team.Dapatkan diskusi tanpa biaya tentang cara daily cataloguing bisa berjalan di samping tim migrasi Anda.

Get a Free ConsultationDapatkan Konsultasi Gratis

Key takeaways come down to three things to do this weekPoin penting dirangkum dalam tiga hal untuk dilakukan minggu ini

Daily cataloguing protects the investment already made in cleansing. If your programme is under way, these three actions give you a clear picture within a few working days.Daily cataloguing menjaga hasil cleansing yang sudah dikerjakan. Jika program Anda sedang berjalan, tiga langkah berikut memberi gambaran yang jelas dalam beberapa hari kerja.

  1. Count the requests raised since the extract date.Split them into Create, Change and Delete, and check how many were catalogued to the project's rules. That number is the current size of your delta.Hitung request yang diajukan sejak tanggal extract.Pisahkan menjadi Create, Change, dan Delete, lalu cek berapa yang sudah dikatalogkan sesuai aturan proyek. Angka itu adalah ukuran delta Anda saat ini.
  2. Name one door and one owner for every request.Decide which channel all requests must use, who reviews urgent records afterwards, and who holds the project's current rulebook.Tetapkan satu pintu dan satu pemilik untuk setiap request.Putuskan jalur yang wajib dipakai semua request, siapa yang mereview record mendesak setelahnya, dan siapa yang memegang aturan proyek versi terbaru.
  3. Agree the delta handover with the project team.Set the schedule for sending delta lists, the rule for changes to cleansed records and a provisional freeze date before the final extract.Sepakati serah terima delta dengan tim proyek.Tentukan jadwal pengiriman daftar delta, aturan untuk perubahan pada record yang sudah bersih, dan tanggal freeze sementara sebelum extract terakhir.