Questions to Ask About SCS® ANSI Before an ERP Migration

How the ANSI module in SCS® handles item requests, duplicate checks, approvals and audit trails, answered for IT and supply chain teams.

A common assumption in ERP migration programmes is that the ANSI module in SCS® can wait until after go-live, once the new system has settled. In practice, the questions it answers, about who may create, change or delete a material record, are better settled before the first migration load than after it.Banyak proyek migrasi ERP menganggap modul ANSI di SCS® bisa disiapkan belakangan, setelah sistem baru berjalan stabil. Kenyataannya, pertanyaan yang dijawab modul ini, yaitu siapa yang boleh membuat, mengubah, atau menghapus record material, lebih baik dituntaskan sebelum data pertama dimuat ke ERP baru, bukan sesudahnya.

The ANSI module is the data governance module in Spares Cataloguing System® (SCS®). It gives every Create, Change and Delete request for a material record one controlled route: Request, Validate, Approve, Catalogue and Maintain. It sits upstream of the ERP or EAM, and only records that have been approved and catalogued are written to it.Modul ANSI adalah modul data governance di dalam Spares Cataloguing System® (SCS®). Modul ini memberi satu jalur terkontrol untuk setiap request Create, Change, dan Delete atas record material: Request, Validate, Approve, Catalogue, dan Maintain. Posisinya di hulu ERP atau EAM, dan hanya record yang sudah disetujui dan dikatalogkan yang ditulis ke sistem tersebut.

The ten questions below are the ones worth asking before the migration plan is locked. They are grouped into four parts, so you can go straight to the part that matches where your programme stands today.Sepuluh pertanyaan di bawah ini layak diajukan sebelum rencana migrasi dikunci. Pertanyaannya dibagi ke dalam empat kelompok, jadi Anda bisa langsung menuju kelompok yang paling sesuai dengan posisi proyek Anda saat ini.

What Is the ANSI Module, and What Is It Not?Apa Itu Modul ANSI, dan Apa yang Bukan Tugasnya?

1. What exactly is the ANSI module in SCS®?1. Apa sebenarnya modul ANSI di SCS®?

Short answer. It is the data governance module inside SCS®, not a separate application.Jawaban singkat. Modul ini adalah modul data governance di dalam SCS®, bukan aplikasi terpisah.

ANSI is where requests to create, change or delete material records are submitted, checked and decided. It works as part of SCS®, the same system used to catalogue and standardise material data. The governance step and the cataloguing step therefore run in one system, rather than in two tools that have to be reconciled later.ANSI adalah tempat request untuk membuat, mengubah, atau menghapus record material diajukan, dicek, lalu diputuskan. Modul ini bekerja sebagai bagian dari SCS®, sistem yang sama yang dipakai untuk mengatalogkan dan menstandarkan data material. Artinya, tahap governance dan tahap cataloguing berjalan dalam satu sistem, bukan di dua tools yang nantinya harus dicocokkan ulang.

For a team responsible for IT governance and data, that has a practical consequence. When someone asks why a particular record exists in the new ERP, the request behind it, the decision on it and the cataloguing work that followed sit in the same place. There is no separate ticketing system, shared inbox or spreadsheet to search through first.Bagi tim yang memegang tata kelola IT dan data, hal ini punya konsekuensi praktis. Saat ada yang bertanya mengapa sebuah record ada di ERP baru, request yang melatarinya, keputusan atasnya, dan pekerjaan cataloguing sesudahnya tersimpan di tempat yang sama. Tidak perlu lebih dulu menelusuri sistem tiket, inbox bersama, atau spreadsheet yang terpisah.

2. Where does it sit relative to SAP, Maximo, Oracle, Pronto or Odoo?2. Di mana posisinya terhadap SAP, Maximo, Oracle, Pronto, atau Odoo?

Short answer. Upstream. Requests are handled in SCS® before anything is written to the ERP or EAM.Jawaban singkat. Di hulu. Request ditangani di SCS® sebelum apa pun ditulis ke ERP atau EAM.

The ANSI module is positioned in front of the ERP or EAM, whether that is SAP, IBM Maximo, Oracle, Pronto or Odoo. The ERP remains the system that runs transactions such as purchase orders, reservations and work orders. ANSI decides which material record requests may proceed, and the cataloguing stage in SCS® prepares those records in an ERP-ready format.Modul ANSI ditempatkan di depan ERP atau EAM, entah itu SAP, IBM Maximo, Oracle, Pronto, atau Odoo. ERP tetap menjadi sistem yang menjalankan transaksi seperti purchase order, reservasi, dan work order. ANSI memutuskan request record material mana yang boleh lanjut, lalu tahap cataloguing di SCS® menyiapkan record tersebut dalam format yang siap masuk ERP.

The rule that follows is simple to state: only records that have been approved and catalogued are written to the ERP. A request still under review, or one that has been rejected, does not reach the material master. For a migration, this gives the target system one defined entry route for material data instead of several, which can make it easier to show auditors and data owners how each record arrived there.Aturan turunannya mudah dirumuskan: hanya record yang sudah disetujui dan dikatalogkan yang ditulis ke ERP. Request yang masih direview, atau yang sudah di-reject, tidak sampai ke material master. Dalam migrasi, ERP baru jadi punya satu jalur masuk yang jelas untuk data material, bukan beberapa jalur sekaligus, sehingga bisa lebih mudah menunjukkan kepada auditor dan pemilik data bagaimana setiap record bisa ada di sana.

3. Does the ANSI module replace cleansing the legacy data?3. Apakah modul ANSI menggantikan cleansing data lama?

Short answer. No. Cleansing deals with the records you already have; ANSI governs the requests that come after.Jawaban singkat. Tidak. Cleansing menangani record yang sudah ada, sedangkan ANSI mengatur request yang datang sesudahnya.

This is one of the more common misreadings. A migration usually carries years of legacy material data: inconsistent names, missing attributes and duplicates hiding under different part numbers. That backlog is the job of a cleansing and standardisation effort such as Panemu's Material Cataloguing Service, which works through data assessment and audit, catalogue design and governance setup, cleansing and standardisation, classification and coding, and finally catalogue delivery to the target system.Ini salah satu salah kaprah yang cukup sering muncul. Migrasi biasanya membawa data material lama yang menumpuk bertahun-tahun: penamaan tidak konsisten, atribut kosong, dan data dobel yang bersembunyi di balik part number berbeda. Tumpukan itu adalah tugas pekerjaan cleansing dan standardisasi, misalnya Material Cataloguing Service dari Panemu, yang berjalan melalui data assessment dan audit, desain katalog dan penyiapan governance, cleansing dan standardisasi, klasifikasi dan coding, hingga penyerahan katalog ke sistem tujuan.

The ANSI module addresses a different problem. Once a cleansed baseline exists, new requests keep arriving from maintenance, warehouse, procurement and engineering. Without a governed route, those requests can bring back the same issues the cleansing work set out to fix. The two pieces work in sequence: cleansing sets the baseline, and ANSI controls what changes it afterwards.Modul ANSI menangani persoalan yang berbeda. Begitu baseline hasil cleansing tersedia, request baru terus berdatangan dari maintenance, gudang, procurement, dan engineering. Tanpa jalur yang diatur, request tersebut bisa memunculkan kembali masalah yang justru ingin dibereskan lewat cleansing. Keduanya bekerja berurutan: cleansing membentuk baseline, lalu ANSI mengendalikan perubahan apa pun yang terjadi sesudahnya.

Unsure where cleansing ends and governance begins?Belum jelas batas antara cleansing dan governance?

Talk it through with our team in a free consultation, using your own migration scope.Bahas bersama tim kami dalam konsultasi gratis, berangkat dari scope migrasi Anda sendiri.

Book a Free ConsultationJadwalkan Konsultasi Gratis

How Does a Request Move From Submission to the ERP?Bagaimana Request Bergerak dari Pengajuan Sampai ke ERP?

4. What are the five stages, and what happens in each?4. Apa saja lima tahapnya, dan apa yang terjadi di setiap tahap?

Short answer. Request, Validate, Approve, Catalogue and Maintain. The first three run in ANSI, cataloguing runs in SCS®, and maintenance draws on both.Jawaban singkat. Request, Validate, Approve, Catalogue, dan Maintain. Tiga tahap pertama berjalan di ANSI, cataloguing berjalan di SCS®, dan pemeliharaan memakai keduanya.

The five-stage route for a material record requestLima tahap jalur request record material

  1. RequestRequestANSIANSI
  2. ValidateValidateANSIANSI
  3. ApproveApproveANSIANSI
  4. CatalogueCatalogueSCS®SCS®
  5. MaintainMaintainANSI + SCS®ANSI + SCS®
  • Request. One controlled form for Create, Change or Delete, in place of emails, spreadsheets and phone calls.Request. Satu formulir terkontrol untuk Create, Change, atau Delete, menggantikan email, spreadsheet, dan telepon.
  • Validate. The request is screened for duplicates against the ERP master and checked against business rules.Validate. Request di-screening terhadap master ERP untuk mencari duplikat, lalu dicek terhadap aturan bisnis.
  • Approve. An approver with the right role decides, and the decision is written to the audit trail.Approve. Approver dengan peran yang sesuai mengambil keputusan, dan keputusan itu tercatat di audit trail.
  • Catalogue. Only approved requests reach cataloguing in SCS®, where the record is standardised, classified (for example UNSPSC, NCS or eCl@ss), given technical attributes and prepared in an ERP-ready format.Catalogue. Hanya request yang disetujui yang masuk ke cataloguing di SCS®. Di sana record distandarkan, diklasifikasikan (misalnya UNSPSC, NCS, atau eCl@ss), dilengkapi atribut teknis, dan disiapkan dalam format siap ERP.
  • Maintain. The record stays under the same governance for later changes and deletions, with ANSI and SCS® working together.Maintain. Record tetap berada di bawah governance yang sama untuk perubahan dan penghapusan berikutnya, dengan ANSI dan SCS® bekerja bersama.

The order of the stages is deliberate. Screening happens before approval, so the approver decides on a request that has already been checked against what exists. Cataloguing happens after approval, so cataloguing effort goes into requests that are allowed to proceed, not into ones that may later be turned down.Urutan tahap ini disengaja. Screening dilakukan sebelum approval, sehingga approver memutuskan request yang sudah dicek terhadap data yang ada. Cataloguing dilakukan setelah approval, sehingga tenaga cataloguing dipakai untuk request yang memang boleh lanjut, bukan untuk request yang mungkin ditolak belakangan.

5. What happens if the requested item already exists?5. Apa yang terjadi jika item yang di-request sudah ada?

Short answer. The request is rejected.Jawaban singkat. Request tersebut di-reject.

A submitted request appears in the Item Request list in the ANSI module, where it is checked for whether the item already exists. If it does, the request is rejected. If it does not, the request continues towards cataloguing.Request yang diajukan muncul di daftar Item Request pada modul ANSI, lalu dicek apakah itemnya sudah ada. Jika sudah ada, request di-reject. Jika belum ada, request berlanjut ke tahap cataloguing.

Consider a petrochemical plant where a maintenance planner requests a spiral wound gasket for a heat exchanger flange in an aromatics unit. If that gasket is already in the material master, the request is rejected rather than becoming a second code for the same part. What the requester does next is a matter for each organisation's own procedure. It is worth agreeing that procedure before go-live, so a rejected request leads the requester to the right next step instead of a repeat submission.Misalnya, di sebuah pabrik petrokimia, seorang maintenance planner me-request spiral wound gasket untuk flange heat exchanger di unit aromatik. Jika gasket itu sudah ada di material master, request-nya di-reject alih-alih menjadi kode kedua untuk part yang sama. Langkah requester sesudahnya diatur oleh prosedur masing-masing perusahaan. Prosedur ini sebaiknya disepakati sebelum go-live, supaya request yang di-reject mengarahkan requester ke langkah berikutnya yang tepat, bukan ke pengajuan ulang.

6. Does it cover changes and deletions, or only new items?6. Apakah perubahan dan penghapusan ikut diatur, atau hanya item baru?

Short answer. All three. Create, Change and Delete requests travel the same governed route.Jawaban singkat. Ketiganya. Request Create, Change, dan Delete melewati jalur yang sama.

New items tend to get most of the attention, but changes and deletions shape data quality just as much. In the ANSI module, a Create request is screened and validated first, and the record is not created before it is approved. A Change request is reviewed and approved before the ERP record is altered. A Delete request is controlled, and the decision process behind it stays visible.Item baru biasanya paling banyak mendapat perhatian, padahal perubahan dan penghapusan sama besar pengaruhnya terhadap kualitas data. Di modul ANSI, request Create di-screening dan divalidasi lebih dulu, dan record tidak dibuat sebelum disetujui. Request Change direview dan disetujui sebelum record di ERP diubah. Request Delete dikendalikan, dan proses keputusan di baliknya tetap terlihat.

On a petrochemical site, a change might be a corrected pressure rating on a gate valve, or a manufacturer part number updated after a supplier change. A deletion might retire a record that cleansing flagged as a duplicate. Each of these alters what planners and buyers see in the ERP, so each deserves the same review and the same record of the decision as a new item does.Di lokasi petrokimia, contoh perubahan adalah koreksi pressure rating pada gate valve, atau part number manufacturer yang diperbarui setelah pergantian supplier. Contoh penghapusan adalah menonaktifkan record yang ditandai sebagai duplikat saat cleansing. Masing-masing mengubah apa yang dilihat planner dan buyer di ERP, jadi masing-masing layak mendapat review dan catatan keputusan yang sama seperti item baru.

Who Is Involved, and What Gets Recorded?Siapa Saja yang Terlibat, dan Apa yang Dicatat?

7. Who does what in the workflow?7. Siapa mengerjakan apa dalam workflow ini?

Short answer. Four roles, requester, reviewer, approver and data steward, drawn from functions such as Warehouse, Procurement, Engineering, Maintenance and IT.Jawaban singkat. Ada empat peran, yaitu requester, reviewer, approver, dan data steward, yang diisi dari fungsi seperti Gudang, Procurement, Engineering, Maintenance, dan IT.

RolePeran Typical responsibilityTanggung jawab umum Usually drawn fromBiasanya berasal dari
RequesterRequester Submits a Create, Change or Delete request with the reason and supporting detailsMengajukan request Create, Change, atau Delete beserta alasan dan data pendukung Maintenance, Warehouse, Procurement, EngineeringMaintenance, Gudang, Procurement, Engineering
ReviewerReviewer Checks completeness, technical accuracy and any possible matches raised at validationMengecek kelengkapan, ketepatan teknis, dan kemungkinan kecocokan yang muncul saat validasi Engineering, Maintenance, master data teamEngineering, Maintenance, tim master data
ApproverApprover Makes the decision for their area, which is then recorded in the audit trailMengambil keputusan untuk area tanggung jawabnya, yang kemudian tercatat di audit trail Function or plant lead with authority over the itemPimpinan fungsi atau plant yang berwenang atas item tersebut
Data stewardData steward Looks after naming rules, classification and catalogue consistency over timeMenjaga aturan penamaan, klasifikasi, dan konsistensi katalog dari waktu ke waktu Master data or IT governance teamTim master data atau tata kelola IT

A typical split for discussion. Each organisation decides who holds each role and who carries approval authority.Pembagian umum sebagai bahan diskusi. Setiap perusahaan menentukan sendiri siapa memegang peran apa dan siapa yang berwenang memberi approval.

SCS® supports role-based, multi-user access, so these roles can be reflected in who sees and acts on each request. Agreeing on the roles is often the slowest part of governance setup, because it needs sign-off across functions that do not usually approve each other's work. A useful test is whether every role has a named person or team, plus a backup, before the module goes live. A role with no owner tends to become the place where requests wait.SCS® mendukung akses multi-user berbasis peran, sehingga peran-peran ini bisa tercermin pada siapa yang melihat dan menindaklanjuti setiap request. Menyepakati peran sering menjadi bagian paling lama dalam penyiapan governance, karena perlu persetujuan lintas fungsi yang biasanya tidak saling menyetujui pekerjaan. Uji sederhananya: apakah setiap peran sudah punya orang atau tim yang jelas, plus cadangannya, sebelum modul mulai dipakai. Peran tanpa pemilik cenderung menjadi tempat request tertahan.

8. What does the audit trail actually record?8. Apa yang sebenarnya dicatat oleh audit trail?

Short answer. A 5W1H history of each request: who submitted it, what was requested, when, why, and who approved it.Jawaban singkat. Riwayat 5W1H untuk setiap request: siapa yang mengajukan, apa yang diminta, kapan, mengapa, dan siapa yang menyetujui.

Every request carries its own history. The audit trail captures who submitted the request, what was requested or changed, when it was submitted and decided, the business reason given, and who approved it. Because that history belongs to the request itself, it can be reviewed later without piecing it together from emails and meeting notes.Setiap request membawa riwayatnya sendiri. Audit trail mencatat siapa yang mengajukan request, apa yang diminta atau diubah, kapan diajukan dan diputuskan, alasan bisnis yang disampaikan, serta siapa yang menyetujuinya. Karena riwayat itu melekat pada request, riwayat ini bisa ditinjau kembali tanpa harus merangkainya dari email dan catatan rapat.

During a migration, this matters in two ways. Programme teams are often asked to explain why the new material master contains a particular record, especially one created close to cutover. Internal and external audits also tend to ask how master data changes are controlled. A request history with names, dates, reasons and approvals answers both questions with evidence rather than a description of intended practice.Dalam migrasi, hal ini penting karena dua alasan. Tim proyek sering diminta menjelaskan mengapa material master yang baru berisi record tertentu, terutama record yang dibuat menjelang cutover. Audit internal maupun eksternal juga cenderung menanyakan bagaimana perubahan master data dikendalikan. Riwayat request yang memuat nama, tanggal, alasan, dan approval menjawab kedua pertanyaan itu dengan bukti, bukan sekadar uraian tentang praktik yang direncanakan.

9. What should a well-formed request contain?9. Apa saja isi request yang lengkap?

Short answer. Enough for a reviewer to decide without chasing the requester: a proposed name, key attributes, manufacturer details, the reason and supporting documents.Jawaban singkat. Cukup bagi reviewer untuk memutuskan tanpa perlu mengejar requester: usulan nama, atribut utama, data manufacturer, alasan, dan dokumen pendukung.

The example below illustrates the information a strong request carries. It is not a screenshot of the ANSI form, and the actual field names will follow your own catalogue design.Contoh di bawah menggambarkan informasi yang dibawa oleh request yang baik. Ini bukan tangkapan layar formulir ANSI, dan nama field yang sebenarnya akan mengikuti desain katalog Anda sendiri.

What a complete item request can look likeGambaran request item yang lengkap

Item request · sampleItem request · contohSubmitted · awaiting validationDiajukan · menunggu validasi
Request typeJenis requestCreateCreate
Requesting functionFungsi pengajuMaintenance planningMaintenance planning
Site and unitSite dan unitPetrochemical plant A · aromatics unitPabrik petrokimia A · unit aromatik
Proposed item nameUsulan nama itemGASKET, SPIRAL WOUNDGASKET, SPIRAL WOUND
Key attributesAtribut utama4 IN · CL300 · SS316 winding · flexible graphite filler · CS outer ring4 IN · CL300 · SS316 winding · flexible graphite filler · CS outer ring
Manufacturer and part numberManufacturer dan part numberManufacturer A · PN-000000 (sample)Manufacturer A · PN-000000 (contoh)
ReasonAlasanNeeded for planned exchanger flange maintenance; no matching item found in catalogue searchDibutuhkan untuk maintenance terjadwal flange exchanger; tidak ada item yang cocok saat dicari di katalog
AttachmentLampiranManufacturer datasheet (PDF)Datasheet manufacturer (PDF)

Illustrative mock-up with generic sample data, not a screenshot of the product.Mockup ilustrasi dengan data contoh generik, bukan tangkapan layar produk.

Requests that arrive incomplete tend to bounce between requester and reviewer. Agreeing a minimum set of information per item class before go-live helps keep reviews moving: size, pressure rating and materials for gaskets, for instance, or seal type and shaft size for mechanical seals. These minimums usually come straight from the attribute templates set during catalogue design, so the request form and the catalogue speak the same language.Request yang masuk dalam keadaan tidak lengkap cenderung bolak-balik antara requester dan reviewer. Menyepakati informasi minimum untuk setiap kelas item sebelum go-live membantu review tetap berjalan, misalnya ukuran, pressure rating, dan material untuk gasket, atau tipe seal dan ukuran shaft untuk mechanical seal. Informasi minimum ini biasanya diambil langsung dari template atribut yang ditetapkan saat desain katalog, sehingga formulir request dan katalog memakai bahasa yang sama.

Mapping roles and approvals for your sites?Sedang memetakan peran dan approval per site?

Our team can walk through a draft governance setup with you, free of charge.Tim kami bisa menelaah draf penyiapan governance bersama Anda, tanpa biaya.

Talk to Our TeamDiskusi dengan Tim Kami

When Should It Be Ready in a Migration Programme?Kapan Modul Ini Harus Siap dalam Proyek Migrasi?

10. At what point in the programme should the ANSI module be set up?10. Di titik mana dalam proyek modul ANSI sebaiknya disiapkan?

Short answer. Before the cleansed baseline is frozen for migration, so that requests raised during and after cutover follow the same route.Jawaban singkat. Sebelum baseline hasil cleansing dibekukan untuk migrasi, supaya request yang muncul selama dan sesudah cutover melewati jalur yang sama.

A migration has a familiar rhythm: assessment, cleansing and standardisation, test loads, data freeze, cutover and go-live. Governance is often scheduled last because the new ERP is not live yet. The difficulty is that material requests do not pause for the project. If the governed route only starts after go-live, everything requested between the data freeze and stabilisation passes through whatever interim process was improvised, and that tends to be the least controlled route of all.Migrasi punya ritme yang sudah dikenal: assessment, cleansing dan standardisasi, test load, data freeze, cutover, lalu go-live. Governance sering dijadwalkan paling akhir karena ERP baru memang belum berjalan. Masalahnya, request material tidak berhenti hanya karena ada proyek. Jika jalur yang diatur baru dimulai setelah go-live, semua request antara data freeze dan masa stabilisasi akan melewati proses sementara yang serba darurat, dan proses seperti itu cenderung menjadi jalur yang paling longgar kontrolnya.

A more practical sequence, offered as a planning guide rather than a fixed rule, looks like this:Urutan yang lebih praktis, sebagai panduan perencanaan dan bukan aturan baku, kurang lebih seperti ini:

  1. During catalogue design. Agree naming rules, attribute templates, classification and the four roles, and name who holds each one.Saat desain katalog. Sepakati aturan penamaan, template atribut, klasifikasi, dan empat peran tadi, lalu tetapkan siapa pemegang tiap peran.
  2. During cleansing. Set up the request route and train requesters and reviewers on it, using the same standards being applied to the legacy data.Saat cleansing. Siapkan jalur request dan latih requester serta reviewer, dengan standar yang sama seperti yang diterapkan pada data lama.
  3. Before data freeze. Route new and changed item requests through the ANSI module, so they are checked against the cleansed baseline.Sebelum data freeze. Arahkan request item baru dan perubahan item melalui modul ANSI, supaya dicek terhadap baseline hasil cleansing.
  4. At cutover and after go-live. Keep the same route, so the ERP receives only approved and catalogued records from day one.Saat cutover dan setelah go-live. Pertahankan jalur yang sama, supaya sejak hari pertama ERP hanya menerima record yang sudah disetujui dan dikatalogkan.

This sequence also gives the programme a rehearsal. Requesters learn the form, reviewers learn to read screening results and approvers learn the decision step while there is still room to adjust, rather than in the first busy weeks of live operation. How new items are handled while legacy data is still being cleansed is covered separately in this series.Urutan ini sekaligus memberi proyek kesempatan untuk gladi. Requester belajar mengisi formulir, reviewer belajar membaca hasil screening, dan approver belajar tahap keputusan selagi masih ada ruang untuk menyesuaikan, bukan pada minggu-minggu pertama operasi live yang sibuk. Penanganan item baru selama data lama masih di-cleansing dibahas tersendiri dalam seri ini.

Before configuration starts, it helps to have three decisions written down: which functions may raise which request types, who approves for each plant or item class, and which ERP template the catalogued records must match. SCS® exports to ERPs such as SAP, Oracle, Maximo and Odoo using validated templates, so settling the target template early keeps the cataloguing stage aligned with what the migration will load. These decisions belong to the business and IT governance together, and they are easier to make while the migration scope is still being finalised.Sebelum konfigurasi dimulai, ada baiknya tiga keputusan sudah tertulis: fungsi mana yang boleh mengajukan jenis request apa, siapa yang memberi approval untuk setiap plant atau kelas item, dan template ERP mana yang harus dipenuhi record hasil cataloguing. SCS® melakukan ekspor ke ERP seperti SAP, Oracle, Maximo, dan Odoo dengan template yang sudah divalidasi, jadi menetapkan template tujuan sejak awal membuat tahap cataloguing selaras dengan data yang akan dimuat saat migrasi. Keputusan ini menjadi tanggung jawab bersama antara bisnis dan tata kelola IT, dan lebih mudah diambil selagi scope migrasi masih difinalkan.

Planning where governance fits in your timeline?Sedang menentukan posisi governance di timeline Anda?

Get a no-cost conversation with Panemu about sequencing ANSI alongside cleansing.Dapatkan sesi diskusi tanpa biaya dengan Panemu tentang urutan penyiapan ANSI bersama cleansing.

Request a Free SessionMinta Sesi Gratis

Key TakeawaysPoin Penting

  • The ANSI module is the data governance module in SCS®, handling Create, Change and Delete requests for material records through one controlled route.Modul ANSI adalah modul data governance di SCS® yang menangani request Create, Change, dan Delete atas record material melalui satu jalur terkontrol.
  • The route runs Request, Validate, Approve, Catalogue and Maintain, with screening before approval and cataloguing only after approval.Jalurnya adalah Request, Validate, Approve, Catalogue, dan Maintain, dengan screening sebelum approval dan cataloguing hanya setelah approval.
  • If a requested item already exists, the request is rejected; agree your own procedure for what the requester does next.Jika item yang di-request sudah ada, request di-reject; sepakati prosedur internal untuk langkah requester selanjutnya.
  • Requester, reviewer, approver and data steward each need a named owner and a backup before the module goes live.Requester, reviewer, approver, dan data steward masing-masing perlu pemilik yang jelas beserta cadangannya sebelum modul dipakai.
  • The 5W1H audit trail keeps who, what, when, why and who approved attached to every request.Audit trail 5W1H menyimpan siapa, apa, kapan, mengapa, dan siapa yang menyetujui pada setiap request.
  • ANSI sits upstream of SAP, Maximo, Oracle, Pronto or Odoo, and only approved, catalogued records are written to the ERP.ANSI berada di hulu SAP, Maximo, Oracle, Pronto, atau Odoo, dan hanya record yang sudah disetujui dan dikatalogkan yang ditulis ke ERP.
  • Setting it up before the data freeze, rather than after go-live, means cutover-period requests follow the same governed route.Menyiapkannya sebelum data freeze, bukan setelah go-live, membuat request selama masa cutover tetap melewati jalur yang sama.